← Current Affairs
Daily · 12 November 2026

Ministry of Heavy Industries receives 22 bids for 10 GWh Advanced Chemistry Cell (ACC) manufacturing capacity under the PLI ACC Scheme

SSCBankingRailwayGeneral

The Ministry of Heavy Industries (MHI) has received 22 bids from prospective bidders for 10 GWh capacity offered under the Global Tender floated on the Central Public Procurement (CPP) Portal for the selection of beneficiary firms to establish giga-scale Advanced Chemistry Cell (ACC) manufacturing facilities in India. The 10 GWh capacity is earmarked for Grid-Scale Stationary Storage (GSSS) applications and forms part of the overall targeted 50 GWh ACC manufacturing capacity under the National Programme on Advanced Chemistry Cell (ACC) Battery Storage, the Production Linked Incentive (PLI) scheme approved by the Union Cabinet in May 2021 with a total budgetary outlay of ₹18,100 crore. The Request for Proposal (RFP) was floated on 15 July 2026, the pre-bid conference was held on 29 July 2026, the last date for bids was 10 November 2026, and the Technical Bids were opened on 11 November 2026 in the presence of the bidders at MHI. The bidding is being conducted online through a two-stage Quality and Cost Based Selection (QCBS) mechanism; the bidders include ACME Solar Holdings, Amara Raja Advanced Cell Technologies, Exide Energy Solutions, JSW Neo Energy, Reliance Industries and Waaree Energy Storage Solutions. This is the bidding stage: the release does not name any selected beneficiary. According to the release, the 10 GWh allocation for GSSS is expected to support the country's growing energy-storage requirements arising from the expansion of renewable energy.

Drafted with AI assistance from the official PIB release linked above and checked against it by a second AI pass. Not line-edited by a human. Published by Mahesh Srivastava, who corrects any error you report.

Learning context

The scheme behind this tender was approved by the Union Cabinet on 12 May 2021. The Cabinet approved the proposal of the Department of Heavy Industry for the PLI Scheme 'National Programme on Advanced Chemistry Cell (ACC) Battery Storage' for achieving a manufacturing capacity of 50 Giga Watt Hour (GWh) of ACC and 5 GWh of 'Niche' ACC, with an outlay of Rs 18,100 crore. ACC battery storage manufacturers were to be selected through a transparent competitive bidding process; the manufacturing facility would have to be commissioned within two years and the incentive disbursed thereafter over five years. Each selected manufacturer would have to set up an ACC facility of at least 5 GWh and ensure a minimum 60% domestic value addition at the project level within five years. The release expected direct investment of around Rs 45,000 crore and import substitution of around Rs 20,000 crore every year.

Reference: PIB (Cabinet), 'Cabinet approves Production Linked Incentive scheme “National Programme on Advanced Chemistry Cell Battery Storage”', 12 May 2021

Check yourself: according to the Cabinet decision of 12 May 2021, what outlay was approved for the PLI scheme on ACC Battery Storage, and what minimum domestic value addition must each selected manufacturer ensure within five years?

Rs 18,100 crore; 60% at the project level.

Revision task: from this release, note the number of bids, the capacity on offer and the application it is earmarked for, the overall target capacity, the portal used, the dates of the RFP, the pre-bid conference, the last date for bids and the bid opening, and the selection mechanism; from the note, the date of the Cabinet approval, the outlay and the capacity targets. Remember that this is the bid-opening stage, not an award.

Test yourself

The Ministry of Heavy Industries received 22 bids for 10 GWh of Advanced Chemistry Cell (ACC) manufacturing capacity under the PLI ACC Scheme. For which applications is this 10 GWh capacity earmarked?

  1. Grid-Scale Stationary Storage (GSSS)
  2. Electric two-wheelers and three-wheelers
  3. Consumer electronics and mobile phones
  4. Defence and aerospace systems
Show the answer

Answer: Grid-Scale Stationary Storage (GSSS)

The release says the 10 GWh capacity is earmarked for Grid-Scale Stationary Storage (GSSS) applications and forms part of the overall targeted 50 GWh ACC manufacturing capacity under the National Programme on ACC Battery Storage. The Technical Bids were opened on 11 November 2026.

Report this question

Read the daily collection → · Editorial standards & corrections